problem_statement

The rush to solution

The first step in any process improvement initiative is to define the problem or business opportunity. This step is often completed far too quickly and in some cases defines a solution without really addressing the real issue.

Paul was a recent case in point. Paul has just commenced a project-based process improvement programme. He works in an assembly area on a mezzanine floor in a manufacturing company.

Products for assembly are brought to Paul and his team by forklift from the ground floor.

Paul’s project was to install a lift in the area as the team were often waiting on the forklift driver. He was quite frustrated that management couldn’t see this and wouldn’t justify the expenditure.

problem_statement

In fact, Paul had presented a solution without actually defining the problem and the impact on the team. We needed to take some steps back and understand what is actually happening.

The team had recently had to wait for an hour on work from the ground floor.

  • How often did this happen?
  • What was the process for ordering material?
  • How was this communicated?
  • How often did work need to be moved?

There was no data on any of these questions and no real process in place for delivering product.

The forklift was also used to receive purchased items, to load deliveries and to manage stock on the ground floor. Any of these activities could delay transfer of work to the mezzanine unless some notice was given or some plan was put in place.

It also became apparent that there was limited product in the process staged for assembly.

There was a need to map the entire process and understand how the work flowed within the business. Mapping forced the team to think about their process and their commitment to their customers. The links between each stage of the process needed to be understood and the team needed to agree ways of working. This is the 2nd stage of process improvement.

The ‘solution’ of installing a lift is now likely to be superseded by a pull system in the short term giving a clear signal to the forklift operator when product needs to move. In the longer term, the team are now considering a cell-based layout on the ground floor.

Like all good Lean systems, there is no mystery, just simple ways to engage the knowledge and experience of the staff already present in every business.

We are very proud of the improvements that all of our participants achieve in 3 months.

You may be interested in applying Lean thinking to your business and putting these ideas into place?

Enterprise Ireland offer support to clients through their Lean Business programmes. Click here for details.

The ManagementWorks project-based Lean Business programme will run in Dublin in December. Click here for details.

 

customer-experience

Who is responsible?

Imagine arriving at these 2 hotels?

How is your initial impression? How would you describe the experience?

 

If it was your business – how would you like it to be represented? Who is responsible for this representation – the individual or the business?

We can continue to assign our problems to individual error or we can delve deeper and explore the systems and processes that we have put into place.

“Management is responsible for 94% of the problems” – W. Edwards Deming – Out of the Crisis

It all starts from day 1.

Does each person hired understand why we are in business and what we are trying to achieve for our customers?

Do we share our processes? – the best ways that we have found so far to deliver our value to the customers.

Do we train our staff so that they fully understand these processes?

Do we support and encourage our staff to propose even better ways that we can improve on these processes?

The result in doing these things may be represented in the hotel on the right. The result in not doing these things could be represented on the left.

Or you may choose to assign responsibility to the individual in the situation.

Help

Lean thinking is concerned with creating the right environment for our business, our employees and our customers.

You may be interested in applying Lean thinking to your business and putting these ideas into place?

ETAC run Lean programmes for businesses and through Enterprise Ireland, IDA and Skillnets.

Programmes will run this Autumn at various locations in Ireland, leading to QQI awards.

Click here for details on the range of programmes available.

 

Does everyone know the score?

Imagine arriving late to a sporting event to see that there is no score on display. Everyone around you is confused as to the actual current score. Or image a sign telling you that the score will be posted as soon as possible after the game finishes.

Would you lose interest in the game? Would the players have the same motivation?

It is often interesting to ask staff in a business how they did the previous week. The answer may be as general as ‘pretty good’ or ‘not a great week’.

Delve a little deeper to ask for some evidence and the answers may be quite vague – ‘well, we had no major issues’ or ‘things were a bit slow’.

How well is performance tracked across your business? Are the relevant things tracked – those most important to the customers of the business or section?

In Sport, performance tracking is essential to driving improvement. Here are some statistics from last season’s English premiership

Score
statistics from www.whoscored.com

English premiership teams playing West Bromwich Albion should know that this team score more goals from set plays than open play. In contrast, one of the top teams, Manchester United, score relatively few goals from set plays. Could this drive significant improvement actions?

Knowing what to measure in each area of every business is essential. It is an opportunity missed if everyone doesn’t know the score. Continuous improvement is supported by facts and good data collection and review.

 

You may be interested in applying Lean thinking to your business and putting these ideas into place?

The ManagementWorks Lean Business programme will run this Autumn at various locations in Ireland.

Click here for details.

 

Lean

Presentations are for managers

There is often a perceived ‘glass ceiling’ by frontline workers. Presentations, meetings and often systems are in the arena of management and many staff are uncomfortable in these areas.

One of our recent programme participants was adamant from the outset that he would not be delivering a presentation in front of ‘strangers’. Furthermore, the concept of running a meeting was alien and presenting work on a ‘computer’ was work normally done by office staff.

Following a lean structure, encouraging all project leaders to clearly identify their issues, engage their team and implement changes based on sound data, the results can be amazing.

3 months later, our participant delivered a 30-slide, 12 minute presentation. He outlined the background to the issues that he wanted to address in his business to a room of ‘strangers’ through simple diagrams and lots of photos. The work and ideas of his team were explained.

The result of the effort was a re-organisation of the workplace, reducing product transportation by over 800 metres per unit and a saving of 3 hours labour time per unit.

The confidence in the presentation delivery gives us huge satisfaction in seeing the personal transformation of an individual now using meetings, data and presentations to drive continuous improvement.

Like all good Lean systems, there is no mystery, just simple ways to engage the knowledge and experience of the staff already present in every business.

We are very proud of the improvements that all of our participants achieve in 3 months.

You may be interested in applying Lean thinking to your business and putting these ideas into place?

The ManagementWorks Lean Business programme will run this Autumn at various locations in Ireland.

Click here for details.

 

Excellent results from the latest Lean programme

You may have thought that Lean process improvement was only relevant to manufacturing staff?

It has been our pleasure to train and mentor this group who completed the 2017 Spring training programme last week.

Let me introduce the group and briefly describe their results to date:

  • Louise works in Finance and managed to uncover potential savings of almost €40k per year from the process for contracted work.
  • Amanda works in Customer Service and used Lean to reduce UK backorders from 17% to 0.6% and fulfil 99.4% of all orders within 24 hours.
  • Kevin was our manufacturing representative and applied 5s, Kanban, SMED and Asset Care to improve the efficiency of his production area.
  • Rosie works in Finance and applied Lean thinking reduce reporting time for all sites from 3 days to 1 day and eliminated some significant system errors whilst doing so.
  • Thomas works in Supply Chain and applied Lean thinking with his team to achieve lead-time reductions from his Far East Supply base. His pilot programme with a key supplier has already yielded an 8-day improvement.
  • Denise works as PA to the General Manager and applied Lean thinking to reverse a downward trend in sales with Irish customers.
  • Christine works in Product Registration and worked to reduce the lead time on product registration application from 55 days to an estimated 15 days.
  • Nigel works in Estimation and has applied Lean thinking to increase output by 44% and reduced backlog by 46% to date.
  • Andy prepares orders for printing and has reduce orders in his area by 38% and increased the value-add time of his process from 40% to over 50% – a 25% increase in capacity!
  • One of the group was on holiday – Lorraine works in Finance and tackled the customer returns process. In 3 months, an additional 20% of returns costs have been reclaimed, the number of processed claims has increased by 20%, the number of outstanding returns in the Irish business is at a third of what it was at the start of the year and the aim is to reduce the overall process lead-time by 50%.

 

We are very proud of the improvements that this group have achieved in 3 months.

You may be interested in applying Lean thinking to your business and putting these ideas into place?

The ManagementWorks Lean Business programme will run this Autumn at various locations in Ireland.

Click here for details.

Excellent results from the latest Lean programme

Lean Training

You may have thought that Lean process improvement was only relevant to manufacturing staff?

It has been our pleasure to train and mentor this group who completed the 2017 Spring training programme last week.

Let me introduce the group and briefly describe their results to date:

  • Louise works in Finance and managed to uncover potential savings of almost €40k per year from the process for contracted work.
  • Amanda works in Customer Service and used Lean to reduce UK backorders from 17% to 0.6% and fulfil 99.4% of all orders within 24 hours.
  • Kevin was our manufacturing representative and applied 5s, Kanban, SMED and Asset Care to improve the efficiency of his production area.
  • Rosie works in Finance and applied Lean thinking reduce reporting time for all sites from 3 days to 1 day and eliminated some significant system errors whilst doing so.
  • Thomas works in Supply Chain and applied Lean thinking with his team to achieve lead-time reductions from his Far East Supply base. His pilot programme with a key supplier has already yielded an 8-day improvement.
  • Denise works as PA to the General Manager and applied Lean thinking to reverse a downward trend in sales with Irish customers.
  • Christine works in Product Registration. Her project was to reduce the lead time of processing a new application request from the commercial team. Products requiring an updated GAP took 55 days.  – this is now estimated to take 15 days in future.
  • Nigel works in Estimation and has applied Lean thinking to increase output by 44% and reduced backlog by 46% to date.
  • Andy prepares orders for printing and has reduced orders in his area by 38% and increased the value-add time of his process from 40% to over 50% – a 25% increase in capacity!
  • One of the group was on holiday – Lorraine works in Finance and tackled the customer returns process. In 3 months, an additional 20% of returns costs have been reclaimed, the number of processed claims has increased by 20%, the number of outstanding returns in the Irish business is at a third of what it was at the start of the year and the aim is to reduce the overall process lead-time by 50%.

We are very proud of the improvements that this group have achieved in 3 months. The programme carries certification and their work will be submitted for a QQI award.

You may be interested in applying Lean thinking to your business and putting these ideas into place?

The ManagementWorks Lean Business programme will run this Autumn at various locations in Ireland.

Lean Click

Skillnets Lean training

Who is responsible?

We had another publicly highlighted case from our health service last week. It would be nice to think that the ‘individual responsible’ will be offered any support to deliver his or her recommendations to improve this situation. The political response suggests that the problem lies with individuals and doesn’t seem to question the process.

So what is the process? Whether it is a 91 year old patient or any other person in need of medical attention, is our process getting better or worse? Are the measures we use in our hospitals centred around patient care and patient outcomes?

Web healthcare

I had the pleasure of listening to David Fillingham in Cork recently. I learned that he had worked at Pilkingtons in St Helens (the location of my first post with Courtaulds in the UK) and joined the NHS in 1989. He spent 6 years as Chief Executive at the Royal Bolton Hospital where he introduced ‘lean’ principles to empower staff and involve patients to improve quality of care. I visited Bolton hospital a few years ago and spoke to staff involved in their lean programmes. Through Value Stream Mapping staff transformed outcomes for stroke patients. Collaborative work with new mothers helped re-design the maternity unit. Lab staff reduced the wait on test results from 24 hours to one hour to deliver quicker decisions on outcomes and release precious beds earlier.

Interestingly, David said that a lot more process engineering went into producing a windscreen at Pilkingtons than into the patient processes in the NHS. Unfortunately, the hard-working staff in our HSE are working with little support or budget to develop their processes. My view is that the best solutions to most issues come from the staff engaged daily in the processes in any organisation. They need a safe environment and supportive leadership to deliver great outcomes.

“A lot more process engineering went into producing a windscreen at Pilkingtons than into the patient processes in the NHS”

Learn more about Lean Business and current supports available at a free workshop in Dublin next Monday. The Lean Business Programme is run by Skillnets under the ManagementWorks initiative.


Lean Business

Monday, 16 November 2015 – 09:30 to 12:30
Talbot Hotel Stillorgan, Dublin

A FREE introduction to Lean Business and current supports available

Give your staff the right training and tools to deliver great results
Make a start with a Lean Business training programme
The Lean Business Programme is run by Skillnets under the ManagementWorks initiative. 

ManagementWorks logo full colour
ETAC will deliver the Dublin programme. The company delivered over 40% of the QQI/FETAC awards in Lean Tools in Ireland in 2014.

Participants reported significant impact on teamwork, quality and waste within their businesses and delivered an average return of €15,000 per project.

Register for the workshop

ManagementWorks Lean Business Programme and Dates

The ManagementWorks Lean Business Programme is already helping dozens of businesses in Ireland to reap the benefits of Lean business tools and Lean thinking. We use a proven combination of training and on-site mentoring to help you and your team members to understand Lean, build Lean skill sets within your business, and deliver one or more lean improvement projects from start to finish.

Who should participate?

Any manufacturing or service company where operational efficiency is a critical factor in success. Participants can be the business managers or front-line staff. You can select a team of up to four participants from your company. Each participant will deliver a process improvement project in their area of the business.

What does the programme consist of?

  • A twelve-week focused business impact programme
  • Eight half-day in-company mentored sessions working on the specifics of your business
  • Five practical one-day group workshops – all participating companies attend together
  • Learning is practical and dynamic
  • Participants will be encouraged to share and pool experiences so that delegates will benefit from ‘real life’ experiences

How will your business benefit?

Adopting Lean tools and techniques is a proven approach to business that is being embraced by an increasing number of organisations. Why? Because it is delivering serious competitive advantage to companies who engage in the process. Previous participants on our programmes are using Lean to deliver measureable improvements across a wide range of business outcomes, such as

  • Improved cash flow
  • Productivity
  • Waste reduction
  • Lead-times reduction
  • Employee engagement
  • Quality
  • Customer Service.

By participating in this programme, you and your team members will:

  • Develop a clear understanding and practical knowledge of the tools and practices underpinning Lean
  • Identify and deliver a project or suite of projects that will provide meaningful and measureable improvements for your business
  • Gain the knowledge, skills and confidence to be able to apply Lean principles, tools and techniques to other projects within your business

What is the cost of the programme?

The subsidised cost of the programme is €3,500 per company for up to four participants. This includes all training, mentoring, course materials, lunches and refreshments.
Where is this programme available?
This programme is available in locations throughout Ireland. See ManagementWorks programmes on the ETAC website for upcoming programmes and workshops.

New format FETAC / QQI courses from ETAC.

The level 5 “Lean Manufacturing Tools” programme will be run in a new format in 2015.

Introduction
FETAC LogoIn the early 90’s the concept of Lean Manufacturing was introduced by Womack & Jones. The team studied the automotive industry at the time and found dramatic differences in performance and bottom-line profitability particularly between US and Japanese companies. They found best practice results at Toyota in japan.

The Toyota Production System is concerned with maximising value in any process and eliminating waste whilst transforming the value chain, the sequence of events that deliver the client requirements. The tools target improvement in quality, reliability, workplace organisation, and streamlining material and information flows.
This Level 5 programme is designed to give the delegates an overall knowledge of how to use these key tools. As part of the programme, the learner will apply the tools to an improvement project within their operation. The attendants will be presented with the concepts and techniques allowing to practically apply the tools by using simple exercises and modules.

This is a 5-day programme run over 12 weeks. All participants are required to deliver a Lean improvement project within their business. On successful completion of the course, candidates are awarded a Level 5 credit on the National Framework of Qualifications.

 

Course outline:
Task 1: Lean Thinking

Task 2: Project Charter

Task 3: Kaizen

Task 4: 8-step process improvement

Task 5: Value Stream Mapping

Task 6: Workplace Organisation (5s)

Task 7: Kanban

Task 8: Quick Changeover (SMED)

Task 9: Standard Work

Task 10: Asset Care (TPM)

Times: 9am till 5pm